Projects across Italy
One method, adapted to different buildings and regions.
We define consistent criteria, documentation and decision rules while respecting the specific characteristics of every building.
Discuss a multi-site projectMulti-site property portfoliosHospitality and managed accommodationComparable control plansLocal sampling coordinated around one method
Context first. Testing plan second.
We consider the building type, water use, periods of inactivity, vulnerable users, network layout and available records. Only then do we select sampling points and parameters that answer a specific question.
A result must lead to a decision.
The laboratory report is read together with the sampling location and conditions. If a problem is found, priorities, corrective actions and an effectiveness check are defined.
